Search
Advanced search
Filter by category
Filter by committee
Search results
-
A new ASTM International standard is focused on equipment that will allow for the emergency evacuation of people who are not able to use standard exit facilities in high-rise buildings. The standard, E 2484 , Specification for High-Rise Building External Evacuation Controlled Descent Devices, was developed by Subcommittee E06.77 on High Rise Building External Evacuation Devices, under the…
-
Using a new ASTM standard will improve communication among the many stakeholders that are involved in preparing, evaluating and using cost estimates for new construction projects. The standard, E 2516 , Classification for Cost Estimate Classification System, was developed by Subcommittee E06.81 on Building Economics, which is part of ASTM International Committee E06 on Performance of Buildings…
-
ASTM Subcommittee E06.77 on High-Rise Building External Evacuation Devices is seeking interested persons to participate in standards activity that is focused on egress in emergency situations occurring in multi-story buildings, as well as on the ability of emergency personnel to respond effectively and access fires or other emergencies on higher floors. Committee E06 on Performance of Buildings…
-
An important new ASTM International standard recently approved by Committee E06 on Performance of Buildings is the first of its kind to focus on determining the resistance of annealed architectural glass to thermally induced stresses caused by exposure to sun and shadows. The standard, E 2431 , Practice for Determining the Resistance of Single Glazed Annealed Architectural Flat Glass to Thermal…
-
A new ASTM International standard will assist aerospace companies that are purchasing fine grain titanium alloys. The standard, E 2448, Test Method for Determining the Superplastic Properties of Metallic Sheet Materials, has been developed by ASTM Subcommittee E28.02 on Ductility and Flexure Testing, which is under the jurisdiction of Committee E28 on Mechanical Testing. According to Peter…
-
Firestop systems have become essential components in saving lives and minimizing property damage during a fire. Because the installation of a firestop system is a very exacting, zero-tolerance process, it is imperative that the post-installation inspection of a firestop system also be exacting. Two ASTM International standards developed by ASTM Committee E06 on Performance of Buildings are now…
-
The new, 42nd edition of ASTM Standards in Building Codes , now available for purchase from ASTM International, provides the tools to design and construct buildings that satisfy international code requirements established by the International Code Council (ICC). ICC is comprised of the Building Officials and Code Administrators International (BOCA), the Southern Building Code Congress…, Special offer: buy the online version and receive the print or CD at 50 percent off., For the online subscriptions to ASTM Standards in Building Codes , online basic users have access only to active ASTM standards documents; online plus users have access to all available ASTM standards documents, including active, redline, historical and withdrawn standards. The online basic subscription for an individual is $1,150 (stock # BLDGSVC); for 2-5 users (single site) $3,050 (stock #…
-
ASTM International Committee E28 on Mechanical Testing has begun work on a proposed new standard to describe the test procedure for determining the superplastic forming properties of a material. The committee is actively seeking participation from interested parties in the development of this document. More information on this new activity can be found by entering WK7114 in the site search box on…
-
ASTM International Subcommittee E06.77 on High Rise Building External Evacuation Devices initiated activity at the October 2004 meeting of Committee E06 on Performance of Buildings, by establishing the following three task groups: Platform Devices - Development of specifications for high-rise external platform devices for evacuation of persons when the primary evacuation routes to a safe zone are…