Search
Advanced search
Filter by category
Filter by committee
Search results
-
Physical barrier systems are an important component in protecting high security assets, and the demand for barrier products has intensified. The capability and integrity of these systems must be verified through testing, and ensured through manufacturing and installation compliance with minimum standard requirements for compatibility with tested designs. In order to facilitate this compliance…
-
Continuous friction measurement equipment (CFME) used to determine skid resistance is the focus of a proposed new ASTM International standard. Interested parties are invited to participate in the development of ASTM WK34937 , Guide for Evaluation, Calibration and Correlation of Continuous Friction Measurement Equipment (CFME). The proposed standard is under the jurisdiction of Subcommittee E17.21…
-
Meeting to Establish Task Group to Be Held August 10 A meeting will be held on Aug. 10, 2011, to establish a task group within ASTM Committee E54 on Homeland Security Applications to complete the drafting of two performance standards for chemical vapor detectors in support of the U.S. Department of Homeland Security’s Science and Technology Directorate. The work items for the two proposed new…
-
ASTM International Committee E54 on Homeland Security Applications has developed a new single-laboratory validated standard, ASTM E2787 , Test Method for Determination of Thiodiglycol in Soil Using Pressurized Fluid Extraction Followed by Single Reaction Monitoring Liquid Chromatography/Tandem Mass Spectrometry (LC/MS/MS). The new standard was developed by Subcommittee E54.03 on Decontamination…, ASTM Committee E54 Next Meeting:, Jan. 30 - Feb. 1, 2012, January Committee Week, Atlanta, GA, Technical Contact:, Lawrence Zintek, U.S. EPA Region 5 Chicago Regional Laboratory, Chicago, Ill., Phone: 312-886-2925; zintek.lawrence@epa.gov, ASTM Staff Contact:, Rick Lake, Phone: 610-832-9689; rlake@astm.org, ASTM PR Contact:, Barbara Schindler, Phone: 610-832-9603; bschindl@astm.org Release #8897
-
Interlocking concrete pavements are extensively used in low-speed urban and rural roads throughout Europe and are seeing increased use as an alternative to asphalt and cast-in-place concrete in the United States. A proposed new ASTM International standard will address the management by city and county transportation agencies of roads made from interlocking concrete pavements. The proposed new…, ASTM Committee E17 Next Meeting:, June 5-6, 2011, State College, Pa., Technical Contact:, David R. Smith, Interlocking Concrete Pavement Institute, Herndon, Va., Phone: 703-657-6900, ext. 201; dsmith@icpi.org, ASTM Staff Contact:, Daniel Smith, Phone: 610-832-9727; dsmith@astm.org, ASTM PR Contact:, Barbara Schindler, Phone: 610-832-9603; bschindl@astm.org Release #8857
-
Three-dimensional laser scanning is a maturing technology that holds great promise for capturing highly accurate information about an object or scene by collecting millions of dense measurements very quickly. ASTM International Committee E57 on 3D Imaging Systems is developing new standards for this technology, including ASTM E2807 , Specification for 3D Imaging Data Exchange, Version 1.0. ASTM…
-
ASTM International Committee E54 on Homeland Security Applications is currently developing a series of proposed standards on emergency operations centers. The first of these standards, ASTM E2668 , Guide for Emergency Operations Center (EOC) Development, has now been approved. ASTM E2668 is under the jurisdiction of Subcommittee E54.02 on Emergency Preparedness Training and Procedures. “ASTM…, ASTM Committee E54 Next Meeting:, June 13-15, June Committee Week, Anaheim, Calif., Technical Contact:, (E2668) Glenn Wisbey, North Carolina Division of Emergency Management, Raleigh, N.C., Phone: 919-715-8577; gwisbey@ncem.org ; (WK32133) Lucien Canton, Lucien Canton LLC, San Francisco, Calif., Phone: 415-221-2562; lcanton@pacbell.net ; (proposed operations standard) Frank Kriz, Lighthouse Readiness Group, Phoenix, Ariz., Phone: 602-319-1446; krizassoc@aol.com, ASTM Staff Contact:, Rick Lake, Phone: 610-832-9689; rlake@astm.org, ASTM PR Contact:, Barbara Schindler, Phone: 610-832-9603; bschindl@astm.org Release #8858
-
A new task group within ASTM Committee E57 on 3D Imaging Systems plans to develop standards on position and orientation (pose) determination that could help increase productivity and enhance the global competitiveness of the U.S. manufacturing industry. The task group, under the jurisdiction of Subcommittee E57.02 on Test Methods, is currently working on its first proposed new standard, ASTM…
-
A new ASTM International standard addresses the most effective ways to manage resources when disaster strikes. The new standard, ASTM E2640 , Guide for Resource Management in Emergency Management and Homeland Security, was developed by Subcommittee E54.02 on Emergency Preparedness, Training and Procedures. The subcommittee is under the jurisdiction of ASTM International Committee E54 on Homeland…, Preparedness, • Planning and procedures; • Resource needs assessment; • Specific resources; • Necessary resource agreements; • Inventory process; • Maintenance of resources; and • Information systems., Operations, • Identifying requirements; • Ordering and acquiring; • Mobilization and coordination; • Command and control; • Receipt, tracking and reporting; • Logistics support planning; • Recovering/Demobilization; and • Financial reimbursement. Now that ASTM E2640 has been approved and published, the subcommittee is developing a proposed new standard, ASTM WK24630 , Guide for…, ASTM Committee E54 Next Meeting:, Jan. 31-Feb. 2, 2011, January Committee Week, Baltimore, Md., Technical Contact:, Robert Stenner, West Richland, Wash., Phone: 509-531-6438; robert.stenner@pnl.gov, ASTM Staff Contact:, Rick Lake, Phone: 610-832-9689; rlake@astm.org, ASTM PR Contact:, Barbara Schindler, Phone: 610-832-9603; bschindl@astm.org Release #8754
-
Traffic monitoring is a means of counting and classifying vehicles and measuring vehicle flow characteristics, such as vehicle speed, lane occupancy, turning movements and other items typically used to portray traffic movement. In order for traffic monitoring data to be assessed properly, information on how the data were collected, edited, summarized and reported must be provided. This obligation…